糖心映画社

糖心映画社 | Infrastructure that Delivers Leading specialty contractor engineers, designs and constructs infrastructures for electric power generation and transmission, oil and natural gas pipelines, renewable energy facilities and wireless networks.
Civil & Industrial icon

Palm Beach County Canal Repair L-12

| West Palm Beach, FL

Scope of Work

Furnish all materials, labor, tools and equipment required to repair nearly 4 linear miles (20,300 LF) of the C-24 canal banks. Repairs included removal of existing vegetation, backfill and compaction of the banks to 2H:1V slopes, sodding and installation of (19,760 LF) turf reinforcement mat along repaired areas including 540 LF of rubble riprap, as well as, all other appurtenant and collateral work necessary to complete work required by the Contract Documents.


Project Description

South Florida Water Management District operates and maintains approximately 1,800 miles of canals and levees, 25 major pumping stations and about 200 larger and 2,000 smaller water control structures. After the storms of '04 and '05 ravaged the South Florida canal system, many of these canals were stressed beyond their limits and rehabilitation became critical.

Related Projects

Minot Air Force Base
Civil & Industrial icon

Minot Air Force Base

Crane Work

Minot Air Force Base, ND
Sinclair Refinery
Civil & Industrial icon

Sinclair Refinery

Crane Work

WY
Courtenay Wind Farm
Civil & Industrial icon

Courtenay Wind Farm

Wind Project

Courtenay, ND
305.599.1800 services@mastec.com